A useful sample approval says which part was examined, what was checked and what purchasing may do next. Replace an unqualified sample OK with a record that separates dimensions, trial fit, appearance and any performance requirement still awaiting evidence.
Identify the sample and the assembly
Link the physical sample reference to its full code, drawing revision, quantity examined and review date. For example, XAHJ21-308-6 is a listed zinc-plated carbon-steel roll-in spring-ball nut for EU 30, slot 8 mm, with M6 thread. The specification table and EU308 drawing (PDF) describe the requested variant; they do not identify an unlabelled sample.
For trial fit, identify the actual profile, bolt and attachment. If access will change after the frame is closed, include the future attachment route in the review. XAHJ uses tilt-and-roll insertion; a successful observation applies to the identified assembly. Use the T-slot nuts and bolts catalogue if family identity is unclear.
Keep the approval categories separate
Use the agreed drawing or requirement as the acceptance basis. Record actual observations, units and the tool or method used. Where an acceptance limit is missing, keep the result pending instead of inventing a tolerance.
| Review category | Reference to attach | Evidence and decision to record |
|---|---|---|
| Selected dimensions and thread checks | Applicable drawing and agreed criteria | Actual readings/check results, method and status |
| Insertion and seating | Identified profile and complete mating hardware | Observed entry, seating and access in that assembly |
| Appearance | Agreed visual criteria or reference | Observed condition and identified photographs |
| Material documentation | Document required for this item/order | Document received, scope confirmed or still pending |
| Required performance | Applicable connection requirement | Applicable evidence received, not tested or pending |
Mark each category accepted for the stated scope, rejected, pending, not tested, or not applicable with a reason. Trial fitting does not establish load capacity, corrosion resistance, service life or resistance to loosening. Appearance does not confirm material composition; the spring ball's temporary positioning function does not establish final clamping performance.
Write a clear approval note
Use this fill-in note after completing the relevant checks. It reports no actual sample review or measured result:
Sample [reference] was reviewed against [part and drawing revision] in [identified assembly]. We accept [the checks recorded above]. [Requirement] remains open. The bulk order [may proceed under the stated conditions / remains on hold]. Reviewed by [name], [date].
If fit observations are accepted but a required document remains pending, say whether that missing document holds the order. Once a decision is made, use the sample-to-PO handoff guide to carry its references into purchasing. Use the reference-sample guide for storage and future comparisons.
Agree any additional evidence before ordering
Every incoming batch handled by Sinsdar receives basic visual and selected dimensional checks. This is batch-level inspection, not 100% inspection of every piece or universal performance testing. Material certificates can be requested from suppliers but are not held for every product. Third-party testing may be possible; confirm its scope and availability for the request.