A sample approval becomes useful to purchasing when the bulk PO identifies exactly which decision and specification it carries forward. Between the trial and the order, a drawing, quotation or proposed variant may change. The task is to preserve the approved baseline, resolve differences and state which version governs each order line.
Freeze the approved reference set
Start with the completed approval record, including its limitations and open conditions. Link it to the sample identifier, buyer item, supplier variant and applicable drawing revision. Keep the dated record accessible rather than copying only the words sample approved into the PO. Use the sample approval guide for recording the original review; this handoff starts after that decision exists.
A physical sample can remain a reference, but it should not silently override the documented requirement. Where the sample, drawing and approval note differ, obtain an explicit resolution before issuing the affected order line.
Map the baseline to the bulk order
| PO attachment entry | Reference to carry forward | Question before release |
|---|---|---|
| Item identity | Buyer item and full supplier variant | Is this the sampled variant? |
| Technical basis | Drawing or specification revision | Has the proposed version changed? |
| Approval decision | Sample record identifier and date | What scope and conditions apply? |
| Order scope | Current quote, quantity and packaging agreement | Are commercial changes explicit? |
| Exception record | Approved deviation and effective order line | Is the exception limited or ongoing? |
This is an illustrative, optional cross-reference table, not an RFQ requirement. Attach existing documents instead of rewriting their contents. Identify file revisions in the attachment list so a filename such as final drawing cannot conceal several different versions.
Route changes according to what they affect
Compare the supplier's bulk-order proposal with the approved baseline. A quantity or pricing change needs purchasing review. A changed part, drawing, material, finish or assembly interface needs review by the person responsible for that requirement. A packaging change may also affect receiving instructions. Do not treat all changes as equivalent merely because the item code stays the same.
For each difference, record the old and new references, reason, decision owner and affected PO lines. State whether the existing sample approval still applies, additional evidence is needed, or the line remains on hold. Do not automatically repeat every sample check; define the review needed for the particular change.
Confirm the effective version with the supplier
Ask the supplier to acknowledge the referenced specification and any accepted exceptions. If an acknowledgement names an older revision, resolve it before releasing that line. Preserve the earlier record as superseded rather than replacing it without history. For a change after order placement, identify the affected quantities and agree its application before assuming it covers work already underway.
An approval limited to a particular assembly remains limited to that assembly. It does not establish performance that was never verified, approve other variants, or create supplier batch traceability. Carry those boundaries into the order attachment.
Copy a concise PO handoff note
The wording below is illustrative and optional, not a compulsory enquiry form or a substitute for agreed purchasing terms.
PO [reference], line [line], uses [item/variant] to [specification revision], linked to sample approval [record/date]. Approval scope and remaining conditions: [reference]. Accepted changes: [reference or none]. Effective quantity/order scope: [scope]. Please acknowledge these references and identify proposed deviations before proceeding with the affected line.
Carry the accepted references into your repeat-order BOM. For a Sinsdar sourcing discussion, share the records already available and flag any unresolved change.