A replacement investigation often passes between maintenance, purchasing and a supplier. Keep the reason for each decision with the candidate, not only the final code. This guide provides a record structure for your own work; it is not an anonymized customer case or a claim of a completed replacement.
Preserve what was known about the original
Create one reference for the original part and assembly. Keep any code, photographs, profile information and drawing together. Distinguish a measured feature from a value copied from an old catalogue. If a dimension or material is unknown, leave that question visible instead of filling it from the proposed replacement.
Describe why a replacement is being sought: an unavailable reference, a new source or an assembly change are different situations. Where the assembly itself changes, do not use the original part's previous service as approval for the new arrangement.
Keep a candidate decision log
| Record item | What to retain |
|---|---|
| Original reference | Identity of the old sample and its actual application |
| Candidate | Complete proposed variant and drawing revision |
| Difference found | Specific geometry, access or specification difference |
| Question raised | What information was requested and from whom |
| Evidence received | Document or identified sample linked to the answer |
| Decision | Rejected, awaiting information or approved for a named scope |
| Handover limit | Assembly, variant or condition outside that decision |
Record why a candidate was not selected
A rejected candidate is valuable evidence if the reason is precise. For example, a proposed end-feed route may be unavailable in the serviced frame, while another candidate lacks a controlling dimension. These are different outcomes: one has an identified access conflict; the other is unresolved.
Retain the alternative's reference so it is not inadvertently quoted again as the approved replacement. Do not label an unresolved candidate defective or incompatible with every profile. The log should help the next person understand the actual decision, not rank suppliers.
Close the record at a defined approval point
Link the accepted sample, applicable drawing and approving decision to the purchasing item. Record any remaining requirements that must be resolved before use. Approval of one specimen's fit is not blanket approval of all finishes, sizes or future revisions.
The identification guide covers finding the candidate; sample approval covers the approval scope. This record connects those stages so the next order can use the decision without rebuilding it from scattered messages.
A short existing email trail or a marked drawing is enough to begin. The log is an optional coordination aid, not an additional enquiry form or a prerequisite for asking for sourcing help.