Sinsdar

Purchasing guide

Managing Changes to a T-Slot Fastener RFQ

Keep quotations comparable when quantities, specifications or delivery requirements change while an RFQ is still open.

Read guide
Guide sections

An RFQ change can make yesterday's quotation answer the wrong question. Before comparing prices, make sure each offer reflects the same current quantities, product requirements and delivery scope. A short update tied to the affected lines is usually more useful than forwarding a long email chain and asking suppliers to find the changes.

Keep the current request easy to identify

Give the enquiry a reference and revision or date. Keep item identifiers stable while quotations are being prepared, even when a line is removed. Label a removed line as withdrawn rather than reusing its number for another nut. This lets suppliers connect questions and quoted prices to the intended item.

Send a complete current list with the update when several lines are affected. Retain the previous version for comparison, but state which one suppliers should quote. An attachment named latest does not help if different recipients have different files with that name.

Show what changed and what needs a new answer

Show what changed and what needs a new answer
ChangeInclude in the updateAsk the supplier to revisit
QuantityLine, previous quantity, new quantity and unitPrice basis and quantity conditions
Product requirementRevised drawing or exact changed featureOffered variant and stated deviations
PackagingNew pack contents or labeling requestIncluded work and separate charges
Delivery destination or scopeUpdated destination and requested scopeFreight assumptions and exclusions
Added or withdrawn itemStable line reference and current statusOrder totals and consolidation proposal

For a quantity change, distinguish pieces from packs and forecasts from the quantity being quoted. For a drawing change, attach the revised document and briefly identify the affected feature. Do not require the supplier to discover a technical change by comparing two visually similar files unaided.

Collect comparable revised offers

Send the same applicable update to every supplier whose offer you still intend to compare. Ask each to identify the RFQ revision in its response. If a supplier says the previous price remains valid, record which updated scope that confirmation covers. Silence about a change is not confirmation that it is included.

Check the resulting offer for old quantities, obsolete drawing references and excluded packing work. Use the quotation comparison guide after reconciling those differences. Otherwise, a lower total may simply reflect an older requirement. Keep any proposed alternative separate from the requested baseline until you have decided whether to accept it.

Close the enquiry with one clear purchasing basis

Before placing the order, identify the current RFQ, selected quotation and any agreed clarifications. Check that the order uses those same references. This article concerns changes while asking for offers; changes to an already placed order need a separate discussion about affected quantities and work already underway.

For an optional, illustrative update message, keep the request short:

Please quote RFQ [reference/revision], replacing [previous version]. Changes affect [lines]: [brief changes]. The attached list contains the current scope. Please confirm whether your offer changes and identify any unresolved questions or exclusions.

Send the revised files through your existing purchasing conversation or a Sinsdar sourcing enquiry. Use your own list format; the important point is a shared, current requirement.

Send the latest enquiry revision

Share your current list and point out the lines or requirements that changed.